BEKOMAT
®
12i / 12i CO / 12i CO PN63
13.2 Dismantling work
For dismantling work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must have
been completed.
Tools
•
Spanner or adjustable end wrench
1.
Decommissioning has been completed.
Depressurise the pressurised system or the respective system section and secure it against unintentional
2.
pressurisation.
Illustration
X2
X3
F
F
68 | 76
Prerequisites
Material
•
No material necessary
Preparatory tasks
Dismantling work
Description / explanation
X4
23
X2
X3
X4
23
Original installation and operation manual
Always to be worn:
1. Remove the hose [X4] from the hose connection [23]
and disassemble.
2. Remove the condensate inlet line [X2] and the
recommended shut-off valve [X3] from the condensate
inlet [F] and disassemble.
3. Disassemble all power supplies.
Protective equipment