Download Print this page
Zippity NEWPORT ZP19002 Assembly Instructions Manual

Zippity NEWPORT ZP19002 Assembly Instructions Manual

Vinyl picket fence with post and no-dig steel pipe anchor kit (36” h x 72”w)
Hide thumbs Also See for NEWPORT ZP19002:

Advertisement

Quick Links

ASSEMBLY INSTRUCTIONS
NEWPORT
VINYL PICKET
FENCE WITH POST
AND NO-DIG STEEL
PIPE ANCHOR KIT
(36" H X 72"W)
Approximate assembly time
Want to see a video on how to
assemble this product?
WWW.ZIPPITY-OUTDOOR.COM
WWW.ZIPPITY-OUTDOOR.COM
60 MIN
Scan the QR code
ASSEMBLY
INSTRUCTIONS
ZP19002
ZP19002
Finishing Post
(ZP19003)
Kit
sold separately.
1
VER. 042921

Advertisement

loading

Summary of Contents for Zippity NEWPORT ZP19002

  • Page 1 ZP19002 AND NO-DIG STEEL PIPE ANCHOR KIT (36” H X 72”W) 60 MIN Approximate assembly time Want to see a video on how to assemble this product? Finishing Post Scan the QR code (ZP19003) sold separately. WWW.ZIPPITY-OUTDOOR.COM WWW.ZIPPITY-OUTDOOR.COM VER. 042921...
  • Page 2 If you experience any further trouble with your product, please contact our customer service department. parts.nychbrands.com support@zippity-outdoor.com 704-892-5222 877-234-6196 Customer service agents are available to take calls weekdays from 8am- 5pm EST. If you call outside of business hours, please leave a voicemail.
  • Page 3 Warning: If your yard has a severe slope or elevation change greater than approximately 5” to 6” over one panel of fence, you will not be able to install this fence. Your post will not be long enough to accommodate this slope. WWW.ZIPPITY-OUTDOOR.COM...
  • Page 4 18 1/2 in 22 7/8 in 20 3/4 in 4 in Ground 2 in 24 in 70 3/8 in 72 in This fence can easily be trimmed down horizontally to fit your custom space. Use fine-toothed circular saw or hack saw. WWW.ZIPPITY-OUTDOOR.COM...
  • Page 5 2” x 3½” x 38⅝” Note: Top rail has picket holes on both sides. Top Rail (1) Rail Bracket (4) 1½” x 3½” x 68¼” 1½” x 3½” x 68¼” Pipe Anchor (1) ¾” Self-Drilling Stainless Steel Screw (24) 1⅝” x 44¾” WWW.ZIPPITY-OUTDOOR.COM...
  • Page 6 Try and drive the pipe anchor as level as possible. Check level about every 12”. After about 18”, the trajectory of the pipe anchor is usually established, and you cannot manually pull the pipe back Hammer to make it level. WWW.ZIPPITY-OUTDOOR.COM...
  • Page 7 2” allow the post to easily insert itself into the to 4” below the ground to prevent it from twisting ground in step 3.3. on the pipe anchor. Repeat for the second post. WWW.ZIPPITY-OUTDOOR.COM...
  • Page 8 Slowly drive the screw with force into the pipe anchor. STEP 4.2 Use a level to straighten the post. Drive a second hex head tek screw into the top of the post using the same process shown in step 4.1. Adjust until level. WWW.ZIPPITY-OUTDOOR.COM...
  • Page 9 Screws (H). The rail bracket should be approximately 2” off the ground. 2 in STEP 5.2 Slide another rail bracket over the opposite end of the Bottom Rail (F), and slide the bottom rail down into the rail bracket installed in step 5.1. WWW.ZIPPITY-OUTDOOR.COM...
  • Page 10 Top Rail rail bracket as illustrated below, and install into the rail brackets. Use (8) ¾” self-drilling the top rail brackets. stainless steel screws to secure brackets to both rails. 18 ½ in WWW.ZIPPITY-OUTDOOR.COM...
  • Page 11 Tip: Install one complete panel of fence first. Then proceed to install one or two pipe anchors, at a time, until you are accustomed to the process. This will prevent repeated mistakes. WWW.ZIPPITY-OUTDOOR.COM...
  • Page 12 Place the rail bracket on the post and mark the locations of the four holes on the post. STEP 7.2 Using a 1/8” drill bit for steel (NOT INCLUDED), pre-drill the post and internal pipe anchor. STEP 7.3 Secure each rail bracket with (4) 3/4” self-drilling stainless steel screws. WWW.ZIPPITY-OUTDOOR.COM...
  • Page 13 ZP19002 ASSEMBLY INSTRUCTIONS 6935 Reames Rd. Ste. K. Charlotte, NC 28216 support@zippity-outdoor.com 704-892-5222 877-234-6196 WWW.ZIPPITY-OUTDOOR.COM WWW.ZIPPITY-OUTDOOR.COM...