General; Tests Before Taking Into Operation - Fayat Bomag BP 20/50 Operating Instructions Manual

Table of Contents

Advertisement

Operation

5.1 General

If you are not yet acquainted with the controls
and indicating elements on this machine you
should thoroughly read chapter "Indicators
and control elements" before starting work.
All indicators and control elements are de-
scribed in detail in this chapter.
26
5.2 Tests before taking into op-
eration
The following inspections must be carried out be-
fore each working day or before a longer working
period.
Danger
!
Danger of accident!
Please observe strictly the safety regulations
in the corresponding section of this instruc-
tion manual!
Park the machine on ground as level as possi-
l
ble.
Cleaning the machine.
l
Check:
condition of engine and machine
l
fuel tank and fuel lines for leaks
l
screw joints for tight fit
l
i
Note
For a description of the following tasks refer to the
chapter "Daily maintenance".
Engine oil level, top up if necessary
l
Fuel level, top up if necessary.
l
1
Water level
, top up if necessary.
l
1
Optional equipment
BOMAG
BP 20/50, BP 25/50

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bomag bp 25/50

Table of Contents