Centrometal PelTec 12 Technical Instructions page 5

Hide thumbs Also See for PelTec 12:
Table of Contents

Advertisement

Back view - PelTec / PelTec-lambda 12-48
VE
SP
PT
PelTec /
Peltec-lambda
12
RP
FC
PE
SP
PT
PelTec /
Peltec-lambda
24-36
RP
PE
FC
Back view - PelTec-lambda 69/96
NOTE:
- main flow tube (probe) and sensor are used only in scheme 2 (DHC), 3 (DHCIIDHW) and 12 (DHCIIDHW(2))
- at boilers 69/96 for this schemes sensor tube (probe) is delivered and must be installed on the main flow, close after
4-way mixing valve (drill hole and make thread M10x1)
- sensor tube (probe) must be sealed
* possible way of installing the fan (output is directed up)
** possible way of installing the fan (output is directed sideways)
Technical instructions PelTec-lambda
SG ¹
DP
PG
TU
PLV
PVV
PP
VE
DP
SG ¹
PG
TU
PLV
PVV
PP
FC
SP
PT
PelTec-lambda
69/96
RP
TP
Dimensions and basic parts of the boiler
SP
PT
PelTec /
Peltec-lambda
RP
SP
PT
PelTec /
Peltec-lambda
RP
TPC
OP
SG ¹
PLV
PLV
PVV
PE
TU
PP
¹ not included in delivery
VE
DP
18
FC
PE
48
FC PE
PP
SG ¹
PG
TU
PLV
PVV
PP
SG ¹
PG
TU
PLV
PVV
5

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the PelTec 12 and is the answer not in the manual?

Table of Contents