C. Splash Pan
Place the perforated splash pan in the water reservoir with legs down.
D. Slide Racks (Pan Racks)
1. Refer to Figure 3-1. Each rack has four loops:
two top, and two bottom. Hold the slide rack
so the ends of the hanger loops are towards
compartment wall, as shown in Figure 3-1.
2. Slide one rack into compartment with the loop
side closest to the compartment wall and rack
slots horizontal.
3. Hook the loops over the top and bottom pins
4. Repeat steps 1, 2, and 3 for the other racks.
E. Vent Nipple
Screw the brass nipple (provided) into the
threaded opening at the top right rear of the appliance.
F. Electric Power Supply
The electric supply must match all electrical and wiring requirements specified on the rating plate.
NOTE: The 1SCE Electrical Diagrams are located on the backs of the right-side panel.
The connection must be made as follows:
1. Install a main disconnect switch and a separate fuse or breaker for this appliance as
shown in Figure 3-2.
The fused disconnect switch is called the Main External Power Switch.
2. Make the electrical connection using flexible conduit, per local code. See Figure 3-3.
MAIN EXTERNAL
POWER SWITCH
SteamCub
Figure 3-2
Electrical Layout
i. Figure 3-1
ii. Slide Rack
Installation
Figure 3-3
Electrical Connection