5.4.2
Daikin-supplied tablet (ASUS ZenPad 8.0
Z380M)
If you choose the local function mode you have to use a Daikin-
supplied tablet to run the intelligent Tablet Controller app.
The intelligent Tablet Controller app can be installed from Google
Play.
6

Preparation

6.1

Before installation

Before you start installing the intelligent Tablet Controller, complete
the following preparations:
▪ Check that the intelligent Tablet Controller kit comes with all
accessories, see
"4.1 Contents of the
▪ Check that you have all equipment necessary to install the
intelligent Tablet Controller kit modules, see
equipment" [ 4  5].
▪ Check that an appropriate space for installing the intelligent Tablet
Controller modules is available, see
place" [ 4  5].
▪ Familiarise yourself with the location of the terminals and switches
of the intelligent Tablet Controller modules, see
switches" [ 4  6].
location of terminals and
6.2

Necessary equipment

Use the following equipment to install the intelligent Tablet Controller
kit modules:
▪ A flat-blade screwdriver
▪ A Phillips screwdriver
▪ The necessary amount of electrical wires and appropriate wiring
tools. For more info on what wires to use, see
requirements" [ 4  7].
6.3

Determining installation place

Make sure to install the intelligent Tablet Controller components in a
place that complies with the conditions described in the following
sections.
6.3.1
About installation place and mounting
direction
Make sure the installation place complies with the following
requirements:
▪ Location: Indoor, inside an electrical cabinet.
DCC601A51
intelligent Tablet Controller
4P414342-1D – 2020.12
kit" [ 4  3].
"6.2  Necessary
"6.3  Determining installation
"6.4  About the
"7.2.1  Wiring
▪ The electrical cabinet:
▪ must be lockable or designed to be opened only with a special
tool. The key or tool should be available only to service
personnel.
▪ must be installed in a space with no access for the general
public.
▪ must comply with the applicable legislation.
▪ must have ingress protection class of IP4X or higher (however,
make
sure
enough
ventilation
overheating of the equipment).
▪ must have impact protection class of IK07 or higher (see
international standard IEC 62262‑2002).
▪ must have a minimum height of 290 mm and minimum width of
410  mm to allow for the clearance specified in
space" [ 4  5].
required
▪ Mounting direction: vertical only
▪ Make sure the installation place complies with the environmental
conditions, specified in
"10.1 Environmental
6.3.2

About required space

The following figure indicates the minimum space required for
installation.
▪ Make sure there is a minimum clearance of 60 mm between both
the CPU module, the I/O module and the wiring ducts and a
minimum clearance of 80  mm between the modules and the
electrical cabinet in the vertical direction.
▪ Make sure there is a minimum vertical clearance of 70  mm
between the WAGO PSU and the wiring ducts.
▪ The CPU module and I/O module can be installed without
clearance in the horizontal direction, but make sure there is a
minimum clearance of 20  mm between the modules and the
electrical cabinet.
▪ The WAGO PSU requires a minimum clearance of 15 mm on both
sides in the horizontal direction.
≥15
50
≥15
152
+ + - -
CPU
L
N
b
a
Wire duct
b
Electrical cabinet
Observe the depth of these modules and make sure you provide the
necessary amount of space in depth in the electrical cabinet.
Module
CPU module
I/O module
WAGO PSU
6 Preparation
is
provided
to
prevent
"6.3.2  About
conditions" [ 4  10].
a
152
≥20
I/O
a
(mm)
Depth
45 mm
39 mm
92 mm
Installation manual
5

Advertisement

Table of Contents
loading

Table of Contents