Harrod BAD-031 Instructions

Harrod BAD-031 Instructions

Floor fixed competition badminton

Advertisement

Code:
BAD-031
Product:
Floor Fixed Competition Badminton
1. 1 x Floor Fixed Badminton Post
2. 2 x Floor Fixed Ali Badminton Base
(Items listed below are packed within FPK030)
3. 4 x M12x30mm Button Head Socket Screw
4. 4 x Large Washer
5. 1 x Velcro Net Ties
6. 1 x 8mm Allen Key

Optional Extras

7. 4 x Standard SH2 Ground Sockets For Solid Floors
7. 4 x Long SH2 Ground Sockets For Sprung Floors
Please read instructions before you begin to assemble your badminton posts.
1
3
2
4
7

Pack Contents:

Pack Contents
(not shown)
6020mm Between Posts
Socket Installation Dimensions
(PEQ117)
(PEQ119)
(BOL142)
(BOL702)
(BAD-060)
(BOL790)
(ASY001+BOL855)
(ASY002+BOL855)
Net Not Included
INS031
04/04/11
Revision 1
©
Harrod UK Limited
5
1
Fig 1
Fig 2

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BAD-031 and is the answer not in the manual?

Questions and answers

Summary of Contents for Harrod BAD-031

  • Page 1 Code: BAD-031 04/04/11 Revision 1 Product: Floor Fixed Competition Badminton © Harrod UK Limited Pack Contents: Pack Contents 1. 1 x Floor Fixed Badminton Post (PEQ117) 2. 2 x Floor Fixed Ali Badminton Base (PEQ119) (Items listed below are packed within FPK030) 3.
  • Page 2 Code: BAD-031 Product: Floor Fixed Badminton Posts Assembly Instructions SH2 Socket Installation (Optional Extra): The sockets should be installed by a specialist, using the following guidelines, please contact your distributor for recommended specialist fitting engineers. Ø Mark at location shown in Fig 2. Drill 20mm holes 160mm deep from floor level for standard SH2 sockets for solid floors or 210mm deep for longer SH2 socket for sprung floors.

Table of Contents