ASSEMBLY INSTRUCTIONS INS849 Revision 0 FBL-849 06/07/2016 Stadium Pro Freehanging Net Supports - 2 Post *Goal and Net sold separately 2 people are recommended for this assembly mins Estimated 45 minutes assembly time per goal (not including time for concrete)
Page 2
Code FBL-849 Product Stadium Pro Freehanging Net Supports - 2 Post Pack Contents Stadium Pro F/Hang Net Supports Stadium Pro F/Hang Post Optional Extras FBL-848 Stadium Pro Goal FBL-851 Stadium Pro Hinged Net Support FBL-308 4mm Box Net Tools Required...
Page 4
Code FBL-849 Product Stadium Pro Freehanging Net Supports - 2 Post Socket Installation Dig holes at a minimum 600mm and concrete in Sockets (14), leaving 40-100mm from top of concrete to ground level PLAN VIEW 9.422m IMPORTANT: Sockets must be leant back 3° diagonally...
Page 5
Code FBL-849 Product Stadium Pro Freehanging Net Supports - 2 Post Assembly Instructions 17mm TOP OF POST HINT: Place Winch and Security Wire Bracket at a comfortable height on the Post. These can be adjusted later during the assembly Page 4...
Page 6
Code FBL-849 Product Stadium Pro Freehanging Net Supports - 2 Post Thread Strap (12) through the larger loop in the Strap Bracket (9) and feed into the slot in the Winch (15). Operate Winch until Strap has passed around the hub and will...
Page 7
Code FBL-849 Product Stadium Pro Freehanging Net Supports - 2 Post Insert Posts in Sockets and attach one end of Headline (19), packed with Net (18), to a Strap. Thread Headline through corner of Net, out the opposite corner and attach to Strap on other Post...
Page 8
Code FBL-849 Product Stadium Pro Freehanging Net Supports - 2 Post Evenly tension the Headline. Thread Security Wire through Net, through both loops in the Strap Bracket on the opposite Post and connect to the Security Wire Bracket. Distribute the Security Wire evenly between the Posts Remove any sag from the roof of the Net.