Harrod BAD-023 Instructions

Harrod BAD-023 Instructions

Socketed competition badminton posts

Advertisement

Code:
BAD-023
Product:
Socketed Competition Badminton Posts
1. Badminton Post x 2
2. Badminton Socket x 2
3. Badminton Socket Lid x 2
4
3
Floor Surface
49.0mm - 50.0mm

Pack Contents:

(PEQ118)
(PLT120)
(PLT019)
IMPORTANT: PLEASE READ THE ASSEMBLY INSTRUCTIONS CAREFULLY
BEFORE STARTING TOASSEMBLEAND INSTALLYOUR BADMINTON POSTS.
View of Product
6020mm Between Posts
Solid Floor Installation
Part 2 sockets shown enlarged
for clear view. Please note, two
views showing installations for
solid and sprung floor types.
Sprung Floor Installation
Guide
4. Velcro Net Ties x 1
Net Not Included
(6060mm Socket Centres)
Ground level when Posts installed
Floor Surface
INS023
Revison 0
16/12/09
©
Harrod UK Limited
(BAD-060)
1
3
2
49.0mm - 50.0mm

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BAD-023 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Harrod BAD-023

  • Page 1 INS023 Code: BAD-023 Revison 0 16/12/09 Product: Socketed Competition Badminton Posts © Harrod UK Limited Pack Contents: 1. Badminton Post x 2 (PEQ118) 4. Velcro Net Ties x 1 (BAD-060) 2. Badminton Socket x 2 (PLT120) 3. Badminton Socket Lid x 2...
  • Page 2 Code: BAD-023 This product is protected by © Copyright and Design Right Harrod UK Ltd 2009. Product: Socketed Competition Badminton Posts Assembly Instructions Pulley Wheel Socket Installation The Sockets should be installed by a specialist using the following guidelines, please contact your distributor for recommended specialist fitting engineers.

Table of Contents