GMI CBL-5464-12.M Quick Start Manual

GMI CBL-5464-12.M Quick Start Manual

Advertisement

TOOLS REQUIRED FOR ASSEMBLY

Socket set w/ 1/2" socket, Open end wrench set,
Cordless drill with 5/16" socket bit (Magnetic
recommended), 1/8" Drill bit, & Tape measure.

BEFORE ASSEMBLING THE WORKBENCH

Assembly of this bench will require 2 people.
Read through the assembly instructions to
familiarize yourself with the order in which the
parts are assembled. We suggest that you clear
& vacuum the area where the bench is to be
assembled. It is important that the bench is
assembled in the same sequence as instructed.
HARDWARE & GMI COMPONENTS
All assembly hardware is provided.
**Units are difficult to move once assembled.
Begin assembly in the bench's final location**
CAUTION: If cabinets are numbered. Be sure
to keep the cabinets in sequential order.
Each station contains 6 individual locker cabinets.
First connect the cabinets side-to-side using (16) lock
nuts and bolts (4 bolts/nuts to connect a pair of cabinets).
Then push them back- to-back and
connect using (12) lock nuts and bolts.
HARDWARE: 5/16" x 3/4" Bolts & Lock Nuts.
Locate a flat & clean surface to work
on. You may want to lay down a
blanket to avoid scratching the tops.
Connect the two halves of your
Maple top using (5) Draw Bolts.
Insert the Draw Bolts in the routered
slots as shown in Figure 1.
Make sure the 2 tops are even on the
finished top side before you fully
tighten the bolts.
Fully tighten all draw bolts.
Figure 2
CBL-5464-12.M
Figure 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the CBL-5464-12.M and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for GMI CBL-5464-12.M

  • Page 1 & vacuum the area where the bench is to be assembled. It is important that the bench is assembled in the same sequence as instructed. HARDWARE & GMI COMPONENTS All assembly hardware is provided. **Units are difficult to move once assembled.
  • Page 2 Position 4 strips of the brown fiberboard material on top of the cabinet as shown. The strips will create a small air gap between the cabinet and worksurface to allow air flow around the top. Carefully flip the top right side up & place on the cabinets as shown to the right.

Table of Contents