Cleaning The Equipment; Maintenance - idi 1000F Series Installation And Maintenance Manual

Monitor suspension system
Table of Contents

Advertisement

Installation and Maintenance Guide for IDI 1000F Series Suspension System with an
MONITOR MOUNT ASSEMBLY ROTATION RESISTANCE
1. The setscrews shown in Figure 7 that were installed in step 6 of "INSTALL
MONITOR MOUNT" on page 12 can be loosened or tightened to adjust the
rotation resistance of the suspended monitor mount assembly.
2. Replace wireway cover after making adjustment.
F.

CLEANING THE EQUIPMENT

No part of this unit is designed to be sterilized in an autoclave. Do not allow
water or other liquids to enter the equipment as this may cause short circuits or
corrosion. Clean parts with a clean cloth dampened with disinfectant or a mild
detergent solution. Do not use abrasives, solvents, sprays or corrosive cleaning
agents. Gently rub with a clean soft cloth to dry.
If room is to be disinfected by means of an atomizer, the equipment must be
covered with plastic or similar sheeting. The equipment must be turned off well
in advance of this procedure to prevent convection currents from drawing the
disinfectant mist into the equipment. After the mist disperses completely, the
sheeting may be removed and the equipment disinfected as described above.
G. MAINTENANCE
"Authorized Technician"
All maintenance procedures should be done by an experienced technician with
demonstrated knowledge and skills (electrical and mechanical) relative to this
type of equipment.
This individual must have access to this manual and the proper tools.
D000-473 REV D
NOV-2018
Adaptor to Shimadzu CH200
Figure 17
Image Diagnostics, Inc.
20
Page

Advertisement

Table of Contents
loading

This manual is also suitable for:

1000f-11000f-6

Table of Contents