Positioning The Probe - Electrode; Fuel Supply; Gas Train Assembly - Riello RX35 S/PV T Installation, Use And Maintenance Instructions

Premix gas burner for tunnel ovens
Table of Contents

Advertisement

Available languages

Available languages

5.7

Positioning the probe - electrode

Before installing the burner on the boiler, make sure the probe
and electrode are placed correctly as in Fig. 9.
20048786
5.8

Fuel supply

The burners are teamed with one-piece pneumatic proportioning
gas valves, via which the amount of gas delivered, and hence the
output produced, can be modulated.
A signal reporting pressure detected in the air circuit is carried to
the pneumatic gas valve, which delivers an amount of gas in pro-
portion to the airflow produced by the fan.
To optimise the bulk, the gas train is assembled directly on the
body of the burner.
Explosion danger due to fuel leaks in the pres-
ence of a flammable source.
Precautions: avoid knocking, attrition, sparks and
heat.
Make sure that the fuel interception tap is closed
before performing any operation on the burner.
The fuel supply line must be installed by qualified
personnel, in compliance with current standards
and laws.
WARNING
5.8.1

Gas train assembly

The connection valve-manifold allows compensating the acci-
dental occlusion of the suction line through the distributed gas re-
duction.
20123803
Installation
WARNING
A
B
DANGER
12
GB
Do not turn the electrode: position it as illustrated.
Placing the electrode near the ionisation probe
may result in the control box amplifier being dam-
aged.
4- 4.5
5- 7
Disconnect the electrical supply by means of the
system's main switch.
Make sure that there are no gas leaks.
Pay attention when handling the train: danger of
crushing of limbs.
Make sure that the gas train is properly installed
by checking for any fuel leaks.
The operator must use the required equipment
during installation.
Fig. 9

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

20042815

Table of Contents