Playcraft Zig Zag Steel Net Wall 1968 Installation Instructions

Advertisement

Quick Links

ZIG ZAG STEEL NET WALL

IMPORTANT NOTES: Read First

(A) Use liquid thread lock (such as Loctite
curing) helps to eliminate the common problem of "thread seizure" in stainless steel hardware by serving as a
lubricant during assembly.
(B) Do not pour concrete until the equipment is completely assembled, leveled and plumbed. Concrete must be
allowed to cure completely before using the equipment (at least 72 hours).
(C) Refer to Installation Manual for 09 Collars assembly instructions.
(D) Use appropriate compliant protective surfacing and adjust footing depths accordingly. See free publication -
The Handbook for Public Playground Safety, Publication #325 at www.CPSC.gov for the surfacing appropriate
for the fall height of the equipment or consult your surfacing supply representative.
Figure 1.1
®
) with all threaded hardware. Important: Liquid thread lock (prior to
Manufactured by Krauss Craft, Inc.
www.playcraftsystems.com
FIGURE 1
Zig Zag Steel Net Wall R5
For Customer Service Call
800.333.8519 (U.S.A.) or
541.955.9199 (International)
1968
Page 1 of 3
See Installation Manual
Sections R5-09 Collars
NOTE: R5 Configuration shown.
R3.5 will vary slightly, but does
not affect the assembly.
Rev B
8/13/2010

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Zig Zag Steel Net Wall 1968 and is the answer not in the manual?

Questions and answers

Summary of Contents for Playcraft Zig Zag Steel Net Wall 1968

  • Page 1 1968 ZIG ZAG STEEL NET WALL Page 1 of 3 IMPORTANT NOTES: Read First ® (A) Use liquid thread lock (such as Loctite ) with all threaded hardware. Important: Liquid thread lock (prior to curing) helps to eliminate the common problem of "thread seizure" in stainless steel hardware by serving as a lubricant during assembly.
  • Page 2 1968 ZIG ZAG STEEL NET WALL Page 2 of 3 Step 1 Refer to Footing Layout and mark footing hole locations. Dig (2) Ø 12" footing holes. Refer to Footing Detail for 85" depth and details. 2159mm IMPORTANT: For areas with soft soil conditions, larger footings may be required.
  • Page 3 1968 ZIG ZAG STEEL NET WALL Page 3 of 3 Step 3 1/4" x 1-3/8" TR Insert legs into footing holes and attach Zig Zag Socket Head Screw Steel Net Wall to collars as shown in Figure 1.1. (See Note A) 3/8"...

Table of Contents