Start-Up Sheet Log - Johnson Controls JRE Series Installation Operation & Maintenance

Water source heat pumps
Table of Contents

Advertisement

W A T E R - S O U R C E H E A T P U M P S
JRE - Series
R e v . : A u g u s t 1 9 , 2 0 2 0

Start-Up Sheet Log

Installer: Complete unit and system checkout and follow unit start-up procedures in the IOM. Use this form
to record unit information, temperatures and pressures during start-up. Keep this form for future reference.
Job Name:
Model Number:
Unit Location in Building:
Date:
In order to minimize troubleshooting and costly system failures, complete the following checks and data
entries before the system is put into full operation.
External Static:
Sheave Setting:
Temperatures: F or C
Pressures: PSIG or kPa
Entering Fluid Temperature
Leaving Fluid Temperature
Temperature Differential
Return-Air Temperature
Supply-Air Temperature
Temperature Differential
Water Coil Heat Exchanger
(Water Pressure IN)
Water Coil Heat Exchanger
(Water Pressure OUT)
Pressure Differential
Compressor
Amps
Volts
Discharge Line Temperature
Motor
Amps
Volts
Allow unit to run 15 minutes in each mode before taking data.
Do not connect gage lines.
40
Street Address:
Serial Number:
Sales Order No:
Turns
Antifreeze:
Type
Cooling Mode
DB
DB
I n s t a l l a t i o n , O p e r a t i o n , M a i n t e n a n c e
%
Heating Mode
WB
DB
WB
DB
WB
WB

Advertisement

Table of Contents
loading

This manual is also suitable for:

Jre036-072Jre096-144Jre168-240

Table of Contents