Original installation and operation manual
Wrong
6.3 Assembly work
For assembly work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must have
been completed.
Tools
•
Spanner or adjustable end wrench
•
Hexagon socket key 10 mm
Depressurise the pressurised system or the respective system section and secure it against unintentional
1.
pressurisation.
Right
Prerequisites
Material
•
Sealants e.g. PTFE
•
Feed line
•
Drain line
•
Hose, interior diameter
13 mm (0.51 in),
length approx. 30 cm (1 ft)
Preparatory tasks
BEKOMAT
Description / explanation
Discharge from pressurised pipes
•
Divert the flow of gas to provide a deflecting
surface to discharge the fluid components in
the gas.
Protective equipment
Always to be worn:
33iU / 33iU CO
®
31 | 68