Beko BEKOMAT 33iU Original Installation And Operation Manual page 49

Table of Contents

Advertisement

Original installation and operation manual
Illustration
20
18
Exchange work
Description / explanation
8
13. If a design shell [8] is attached, carefully lift the design
14. Carefully remove the design shell [8].
20
15. Undo the 4 hexagon socket head cap screws [20] of
19
16. Lift the condensate collecting container [19] and the
17. Dispose of the old Service-Unit [12] and the old
14
18. Clean the condensate collecting container [14].
18
19
19. Clean the cover sealing faces of the condensate
20. Insert the new O-ring [18] into the condensate
shell [8] to the marked positions using a flat head 
screwdriver.
the condensate collecting container cover [19].
O-ring [18] off. 
O-ring [18] properly. For more information, see "14.
Disposal" on page 61.
collecting container cover [19] and wipe down using a
clean cloth and without detergent.
collecting container cover [19] as shown.
BEKOMAT
33iU / 33iU CO
®
49 | 68

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bekomat 33iu coBm33iuBm33iu co

Table of Contents