Download Print this page

Aqualisa Quartz QZ.A1.EV.05 Installation Instructions Manual page 8

Digital exposed with adjustable height head

Advertisement

7
Locate a suitable entry point in the ceiling for the riser rail avoiding joists and
services.
!
The centre of the riser rail stands 45mm from the wall. If this is not suitable,
the spacers provided with the fixing brackets will increase the depth to 70mm
from the wall.
8
Drill a hole through the ceiling minimum Ø30mm, maximum Ø40mm.
9
Feed the riser rail containing the copper pipe
and data cable through the hole in the ceiling.
Ensuring that the control is at the desired
height, the rail is vertical and that there is
adequate working clearance above the top of
the rail in the roof space, mark the fixing points
in the lower bracket.
10
Drill and prepare the holes using the fixings supplied in screw pack no. 2 and
fix the unit to the wall using the screws provided.
!
The ceiling plate cannot be sited against an uneven surface. If there is
coving or an alternative obstruction, please ensure the entry hole is neat
and unobtrusive; otherwise the copper tube could be visible within the
showering area.
If the ceiling height is over 2.4m (8ft), a Quartz Digital riser rail extension kit
will be required. Contact our Customer Service Department to purchase a
riser rail extension kit (part no. 223217).
11
With the rail fixed in place using the lower
fixing bracket, move the top bracket on the
rail to the desired location and mark the fixing
points. Prepare the fixings and screw the top
bracket to the wall using the fixings supplied
in screw pack no. 2.
Quartz Digital exposed with adjustable height head installation instuctions
page 8

Advertisement

loading

This manual is also suitable for:

Quartz qz.a2.ev.05