Initial Start-Up; Operation - Lang 36S-SHM-ECLS Installation, Operation, Maintenance, & Troubleshooting

Electric cruise line salamander
Table of Contents

Advertisement

5.1 PRE-POWER ON

Initial Start-up

Before the initial use of the Salamander, the unit must be wiped down thoroughly with a
dry rag, to remove any oils used in manufacturing. Note: There may be a small amount
of smoke from the unit for the first couple of hours of use, this is normal.
CAUTION:
ALWAYS KEEP THE AREA NEAR THE APPLIANCE
FREE FROM COMBUSTIBLE MATERIALS.
CAUTION:
KEEP FLOOR IN FRONT OF EQUIPMENT CLEAN AND
DRY. IF SPILLS OCCUR, CLEAN IMMEDIATELY, TO
AVOID THE DANGER OF SLIPS OR FALLS.
6.1 Salamander Controls
The controls are located on the front, right side of the unit. There is one infinite
control switch. The positions on the switch are: Low, Medium-low, Medium,
Medium-high, High, & Off.
The Salamander rack is adjustable. There are three rack positions available. To set
the position, put the product on the rack, push the lever down and forward into one
of the positions.
INITIAL START UP
8

OPERATION

Advertisement

Table of Contents
loading

Table of Contents