Instructions For The Installation Engineer - Progress PHN 1220 User Manual

Built-in under
Hide thumbs Also See for PHN 1220:
Table of Contents

Advertisement

Available languages

Available languages

Instructions for the installation engineer

Installation and connection must
be done in compliance with the
regulations in force. All repairs
may only be carried out once the
appliance is turned off. Repairs
must only be carried out by
qualified service engineers.
The
manufacturer
liability in cases where safety
regulations
followed.
Connecting to the electrical supply
Please take note of the following re-
quirements before connecting:
-
The fuse or other protective device and
the domestic electrical installation
must be designed for the max. load of
the appliance (see rating plate).
-
The domestic electrical installation
must be equipped with a proper earth
connection in accordance with the
regulations in force.
-
The socket or multi-pole off switch
must be easily accessible, even after
completed installation of the appli-
ance.
The appliance is shipped without a
mains cable, as - depending on the type of
supply available - a mains lead with a
standard plug designed for the load speci-
fied on the rating plate is required. Insert
the plug into a socket that satisfies the
regulations.
The following cable types are suitable
for use as mains cables, taking into ac-
count the respective rated cross-section
required:
H07RN-F, H05RN-F, H05RR-F, H05VV-F,
H05V2V2-F (T90), H05BB-F.
If the appliance is connected without a
plug, or if the plug is not accessible, a
multi-pole off switch (e.g. fuses, circuit
breaker) with a minimum gap of 3 mm
between the contacts must be installed
between the appliance and mains connec-
tion. The switch must not interrupt the
protective conductor at any point. The
yellow/green protective conductor must
denies
have
not
been
all
progress 23

Advertisement

Table of Contents
loading

Table of Contents