Introduction; Recommended Maintenance; Preventive Maintenance Inspection Report; Required Tools And Supplies - GE Marquette MAC 5000 Field Service Manual

Resting ecg analysis system
Hide thumbs Also See for Marquette MAC 5000:
Table of Contents

Advertisement

Introduction

Recommended
Maintenance
Preventive Maintenance
Inspection Report
Required Tools and
Supplies
Revision B
Regular maintenance, irrespective of usage, is essential to ensure that
the equipment will always be functional when required.
Unless you have an Equipment Maintenance
Contract, GE Marquette Medical Systems
does not in any manner assume the
responsibility
recommended
The
sole
individual or institution using the equipment.
GE Marquette Medical Systems service
personnel may, at their discretion, follow the
procedures provided in this manual as a
guide during visits to the equipment site.
To help you establish a systematic maintenance routine, GE Marquette
Medical Systems recommends that, every six months, you perform the
maintenance checks and test procedures on the "Preventive
Maintenance Inspection Report," included at the end of this chapter.
In addition to a standard set of hand tools, you will need the items listed
below.
Item
#10 TORX driver
Leakage current tester
Multifunction micro-simulator
Precision dust remover
Lint-free soft cloth
MAC 5000 resting ECG analysis system
2000657-002
Maintenance: Introduction
NOTE
for
performing
maintenance
procedures.
responsibility
rests
Table 3-1. Tools and Supplies
MT-1216-02AAMI (for 220V)
MT-1216-01AAMI (for 110V)
MARQ 1
TX609
the
with
the
Part Number
3-3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents