4. Bottle pressure regulator to be assembled.
5. Filling hose to be assembled.
6. Filling and control fitting to be assembled.
7. Provide pressurised air supply.
20/38
a) Remove green protective cap.
b) Bottle pressure regulator to be screwed at the nitrogen outlet thread.
c) Tighten the nut with a spanner.
a) Filling hose to be screwed on to the bottle pressure regulator.
b) Tighten the nut with a spanner.
a) Insert the bayonet plug of the Filling and control fitting into the bayonet coupling of the
filling hose.
a) Pressurised air hose of the customer-side pressuriesed air supply on the pressurised air
adapter.
5.
4.
Instructions manual Nitrogen Compact Booster
Assembly
6.