Checks After Installation / 安裝後檢查; Trial Operation / 運轉試驗 - Mitsubishi Electric V-251BW-HK Installation Manual

Bathroom thermo ventilator 220 v single-phase
Hide thumbs Also See for V-251BW-HK:
Table of Contents

Advertisement

5. Checks after Installation / 安裝後檢查
Check the following items before trial operation.
Be sure to put a tick mark in the corresponding tick box □.
Perform trial operation after making these checks.
運轉試驗前請檢查以下項目。
務必在相應的勾選框中打上勾號□。
請先進行這些檢查,然後再執行運轉試驗。
(1) Product installation check / 產品安裝檢查
Is the main unit installed securely, without looseness? ............................................................ Page 8
主機是否安裝牢固,沒有鬆動? ..........................................................................................第8頁
Is the main unit installed within 1° of horizontal? .................................................................. Page 8
主機安裝位置與水平面的角度是否在1°以內? ........................................................................第8頁
Are the product inlet and outlet kept unblocked? .................................................................. Page 6
產品進風口和出風口是否暢通無阻? ....................................................................................第6頁
(2) Electrical work check / 電氣作業檢查
Is an earth leakage circuit breaker installed in the power supply? ............................................. Page 8
電源是否安裝了接地漏電斷路器? .......................................................................................第8頁
Is the wiring connected according to the wiring diagram? ......................................................... Page 9
配線是否按照配線圖進行連接? ..........................................................................................第9頁
Is an appropriate connection unit used? .............................................................................. Page 9
是否使用了適當的連接單元? .............................................................................................第9頁
Is the connected wiring secured with cable clips? .................................................................. Page 9
連接的配線是否用線夾固定? .............................................................................................第9頁
Is the earth connected? ................................................................................................... Page 8
是否接地? .....................................................................................................................第8頁
(3) Others / 其他
Are the louvre directions correct? ....................................................................................... Page11
百葉方向是否正確? ...................................................................................................... 第11頁
*To prevent initial problems, be sure to perform the post-installation checks before hand-over to the customer.
*為防止出現早期問題,請務必在交付給客戶之前執行安裝後檢查。
6. Trial Operation / 運轉試驗
The customer should witness the trial operation.
If the customer is unavailable, the person who placed the order (the owner, etc.) can be the witness.
運轉試驗時客戶應在場見證。
若客戶無法在場,應由下訂單的人員(物主等)在場見證。
1 Checks before trial operation / 運轉試驗前檢查
When electrical work is complete, make sure that all wiring is correct.
電氣作業完成後,確保所有配線正確。
2 Turn on the power (turn on the circuit breaker) / 打開電源 ( 打開斷路器 )
When the power is turned on, the main unit starts.
電源打開後,主機啟動。
12
Reference page / 參考頁次

Advertisement

Table of Contents
loading

Table of Contents