Commissioning; Function Check; Switching On The Measuring Device - Endress+Hauser Prosonic M FMU40 Brief Operating Instructions

Ultrasonic level measurement
Hide thumbs Also See for Prosonic M FMU40:
Table of Contents

Advertisement

Prosonic M FOUNDATION Fieldbus
5

Commissioning

5.1

Function check

Make sure that all final checks have been completed before you start up your measuring point:
• Checklist "Post-installation check".
• Checklist "Post-connection check".
5.2

Switching on the measuring device

When the instrument is switched on for the first time, the following messages appear in a
sequence of 5 s on the display: software version, communication protocoll and language
selection.
ENDRESS + HAUSER
+
E
Endress+Hauser
Commissioning
Select the language
(this message appears the
first time the instrument
is switched on)
Select the basic unit
(this message appears the
first time the instrument
is switched on)
The current measured
value is displayed
F
After
is pressed, you
reach the group selection.
This selection enables you
to perform the basic setup
23

Advertisement

Table of Contents
loading

Table of Contents