Download Print this page

Valor H5 Series Installation Manual page 5

Gas conversion kit for valor 1100m fi replaces

Advertisement

Available languages

Available languages

Continue re-assembly
1. Resintall the rear baffle (6 screws).
2. Reinstall the burner cover (4 screws).
Reinstall the liners and fuel bed
To reinstall the liners and fuel bed to the installation of
the fireplace, see the installation instructions supplied
with the appliance.
Perform aeration adjustment
Once the fuel bed is in place, securely replace the front
window and adjust the aeration lever as necessary. See
the Installation Manual for details.
Because our policy is one of constant development and improvement, details may vary slightly from those given in this publication.
Designed and Manufactured by / for Miles Industries Ltd.
190 – 2255 Dollarton Highway, North Vancouver, B.C., CANADA V7H 3B1
Tel. 604-984-3496 Fax 604-984-0246
www.valorfi replaces.com
Fit the specifi cations label
1. Complete the required details of label "This
appliance was converted on... by..." position along
with the label "This control has been converted...".
2. Fit the labels to the bottom floor of the appliance as
close as possible to the data card and the valve as
indicated below.
BEEN CONVERTED TO PROPANE GAS
ORIFICES: BURNER #360
PILOT # 30
SUPPLY PRESSURE 11" MIN 14" MAX
MANIFOLD PRESSURE 9" W.C.
INPUT 30,000Btu/h MAX
KIT # 785PGKV2
CET APPAREIL (MODELE 785J) A ETE
CONVERTI AU GAZ PROPANE.
INJECTEURS BRULEUR # 360
VEILLEUSE #30
PRESSION D'ADMISSION 11" MIN 14"
MAX. PRESSION A TUBULURE
D'ALIMENTATION 9" COL. D'EAU
DEBIT CALORIFIQUE 30,000Btu/h.
TROUSSE #785PGKV2
4004564/01
3. Replace any remaining doors, covers, and trim.
Data card
5

Advertisement

loading

This manual is also suitable for:

1100mngk1100mpgk