Installing The Ground Bracket And Bottom Cable Management Arms - Cisco UCS X9508 Installation Manual

Server chassis
Hide thumbs Also See for UCS X9508:
Table of Contents

Advertisement

Installation
Figure 20: Gathering Power Cables
What to do next
Attach the remaining cable management arms. See
Management Arms, on page

Installing the Ground Bracket and Bottom Cable Management Arms

The cable management for the bottom set of PSUs installs on top of a ground bracket that provides earth
grounding for the chassis. The bottom cable management is installed indirectly, by attaching to the grounding
bracket. The grounding bracket, in is the part that installs onto the chassis for the bottom three PSUs.
Note
In this topic, top and bottom refer to the location on the chassis. Cable management arms are interchangeable,
so there is no specific top and bottom cable arm.
For the additional ground requirements, see
Attach the ground bracket and bottom cable management arms to the chassis.
a) Align the long side of the ground bracket with the threaded standoff on the chassis.
Note
The earth ground symbol on the side of the chassis indicates the correct location for attaching the ground
bracket.
b) Align the captive screws in the cable management sheetmetal with the threaded standoffs on the chassis.
Installing the Ground Bracket and Bottom Cable Management Arms
Installing the Ground Bracket and Bottom Cable
39.
Earth Ground Considerations, on page
Cisco UCS X9508 Server Chassis Installation Guide
21.
39

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents