Transport And Warehousing; Packing; Transport; Warehousing - ECM Manufacture Casa IV Instruction Manual

Table of Contents

Advertisement

Available languages

Available languages

7.
Clean the groove before installing the
new group gasket
The steam/ hot water nozzle is blocked
Clean the wholes of the steam/ hot water nozzle carefully with a needle or with a paper clip.
For this purpose, you can unscrew also the steam nozzle.
Important!
Do not lose the small gasket between the steam/ hot water nozzle and the winding!
(Item no C449900790)
Replace the steam/ hot water nozzle.
8

TRANSPORT AND WAREHOUSING

8.1 Packing

The CASA is delivered in a special carton and protected by a plastic cover and foam.
Caution!
Keep packing out of the reach of children!
Important!
Keep packing and packing material for possible transport! Do not through it away!

8.2 Transport

• Transport the machine only upright, if possible on a pallet.
• Do not tilt or turn over the machine.
• Do not stack more than three items of the same kind.
• Do not place heavy items on the packing.

8.3 Warehousing

• Keep the machine packed in a dry place.
• Do not stack more than three items of the same kind.
• Do not place heavy items on the packing.
9

DISPOSAL

Instruction manual CASA
8.
Insert the new group gasket with the
chamfered side up again (with ECM
Logo)
WEEE Reg.-Nr.: DE69510123
9.
Replace the seal shower tray as in
(pic 4) and the shower plate
26
ENGLISH

Advertisement

Table of Contents
loading

Table of Contents