■ INPUT WIRING
System /
Application
P1 P2
1K 1L
Single phase /
2-wire
source
k
L1
K
N
P1 P2 P3 1K 1L
Three phase /
3-wire,
k
source
L1
balanced load
K
L2
L3
P1
source
L1
L2
L3
Three phase /
N
4-wire,
unbalanced load
P1
u v
source
U V
L1
L2
L3
N
Note: Use CLSE for CT.
Grounding is unnecessary for low-voltage circuit.
COMMUNICATION CABLE CONNECTIONS
■ MASTER CONNECTION
Master Station
DA
Terminating
Resistor
DB
DG
SLD
FG
Note: Be sure to turn ON the terminating resistor located at both ends of the modules.
Crosswire between terminals DA – DB.
Master unit is connectable at both ends and at other points.
Terminal
P1 P2
1K 1L
u
v
l
load
source
k
U
V
L1
L
K
N
P1 P2 P3 1K 1L
u
v
v
u
l
k
load
source
U
V
V
U
L1
L
K
L2
L3
P2
P3
N
1K 1L
2K 2L
3K 3L
k
l
load
k
l
K
L
k
l
K
L
K
L
P2
P3
N
1K 1L
2K 2L
3K 3L
u v
u v
k
l
load
U V
U V
k
l
k
l
K
L
K
L
K
L
Blue
White
Yellow
5-2-55, Minamitsumori, Nishinari-ku, Osaka 557-0063 JAPAN
Phone: +81(6)6659-8201 Fax: +81(6)6659-8510 E-mail: info@m-system.co.jp
System /
Application
Single phase /
P1 P2 P3 1K 1L 3K 3L
3-wire
Three phase /
source
3-wire
l
load
L1
unbalanced load
N / L2
L
L3
(2CT)
P1 N
Three phase /
4-wire,
source
l
load
L1
balanced load
L
L2
L3
N
Remote Station
DA
DB
DG
SLD
FG
R7CWTU
Terminal
P1 P2 P3 1K 1L 3K 3L
u
v
v
u
k
l
load
source
k
U
V
V
U
L1
K
L k
l
K
N / L2
L3
K
L
1K 1L
P1 N
1K 1L
u
v
k
l
k
load
source
U
V
L1
K
L
K
L2
L3
N
Remote Station
DA
Terminating
DB
Resistor
DG
SLD
FG
EM-7814 Rev.3 P. 5 / 18
l
load
L k
l
K
L
l
load
L
Need help?
Do you have a question about the R7CWTU and is the answer not in the manual?