4 Shipment and on-site trans-
port
The work described in this section is only to
be performed by personnel appropriately
qualified to carry out such tasks.
4.1 Accepting the delivered
goods
After receiving the shipment, proceed as fol-
lows:
1. Compare the shipment received with the
delivery note.
2. Check the shipment for transportation
damage. Report any damage to
SAMSON and the forwarding agent (re-
fer to delivery note).
4.2 Removing the packaging
from the compact controller
Note
Do not remove the packaging until immedi-
ately before mounting and start-up.
1. Remove the packaging from the compact
controller.
2. Check scope of delivery (see Fig. 4-1).
3. Dispose and recycle the packaging in ac-
cordance with the local regulations.
EB 6493 EN
Shipment and on-site transport
1x
TROVIS 6493 Compact Controller
including seal for .panel mounting (0430-
1495)
1x
Document IP 6493
(Important Product Information)
1x
Accessory 1400-7411, consisting of
2x
Mounting clamp for panel mounting
1x
10-pole screw terminal
1x
14-pole screw terminal
1x
Adhesive label kit with units
Fig. 4-1: Scope of delivery
4.3 Transporting the compact
controller
Transport instructions
− Protect the compact controller against ex-
ternal influences (e.g. impact).
− Protect the compact controller against
moisture and dirt.
− Observe transport temperature depend-
ing on the permissible ambient tempera-
ture (see the 'Design and principle of op-
eration' section).
4.4 Storing the compact
controller
NOTICE
!
Risk of damage to the compact controller
due to improper storage.
Î Observe the storage instructions.
Î Avoid long storage times.
Î Contact SAMSON in case of different
storage conditions.
4-1