Download Print this page

Perlick HP15TS-3 A Series Installation Manual page 6

Beer dispensing equipment
Hide thumbs Also See for HP15TS-3 A Series:

Advertisement

1.
Locate the dispensing head , black beer line(s), and hose
clamp(s). Slide one end of each beer line onto the stainless
steel tubes which protrude out the bottom of the dispensing
head and clamp tight.
2.
Remove transit tape with a utility knife around the hole in the
top of the unit from both inside and outside of the cabinet.
Gently punch out foam w/screwdriver and remove. Insert the
beer line(s) through the hole in the counter top. Move head
aside and bead silicone around perimeter of hole, and then
position the head back in place. Fasten using the 4 chrome
screws included with the dispensing head. Wipe off excess
silicone to complete the seal.
3.
Use the 3/8" -thick foam pad included in the tapping kit and
roll into a cylinder. From inside the cabinet, insert the foam
tube up through the hole in the counter top until it is firmly
against the insulation in the dispensing head. Mark, then cut
away any excess foam.
NOTE: If using an Adara tower, foam needs to be installed so
that it is pressed up against the bottom mounting flange of
the tower.
6 | perlick.com/residential
PERLICK RESIDENTIAL INSTALLATION MANUAL FOR BEER DISPENSING EQUIPMENT
INSTALLATION

Advertisement

loading