Figure 4
Frame
Header
Figure 5
9
PAGE 4 OF 12
ASSEMBLY CONTINUED
7
8
Frame
Sill
Figure 6
1-800-295-5510
uline.com
6. Insert rear legs (3) into corners between the bottom
and the side. Bolt leg to side using two bolts and
nuts per leg. (See Figure 4)
7. Place door and frame assembly (7 and 8) over
the locker body. Attach top to frame header and
bottom to frame sill (one bolt each). Finish by
attaching door and frame assembly to the sides
of the locker body. (See Figure 5) If joining a unit
beside another unit skip to JOINING UNITS TOGETHER
below.
8. With two people, being careful not to put all the
weight on the rear legs, stand unit upright and
place in desired location. Check and tighten all
permanent bolts. (See Figure 6)
JOINING UNITS TOGETHER
1. If joining a unit beside another unit, temporarily
install a bolt and nut into the third and sixth holes
down from the top of the outer frame(s) that will be
joined to the adjacent locker frame(s). (See Figure 6)
2. With two people, being careful not to put all the
weight on the rear legs, stand units upright and
place in desired location. Remove bolts placed
temporarily. Using those bolts, bolt adjacent units
together through frames. Check and tighten all
bolts.
NOTE: If the bolts placed temporarily are not
removed before the frames are joined side by
side, the frames will have a 1/8" gap between
them.
SECURING UNITS
1. Anchor units to wall or floor. Units are not intended
to stand free and may topple if not secured. (Units
standing back to back should be bolted together.)
CAUTION! Care must be taken to assure
that lockers are set plumb and true before
anchoring.
2. Use supplied leveling feet and hardware (9) to level
the unit. (See Figure 6)
0321 IH-7585