If the plate is placed correctly (Fig. 33), the nose can be seen in the area between the upper and lower part of the
plate (Fig. 34).
Fig. 33
Fig. 34
The installation of the oven changer TW 7650 is now carried out analogously to section 2.6 Installation of the
TO 7280.
2.8
Switching on the unit and initial conditioning
Set the stirring speed on the TM 235 TO.
Please do not forget the stirrer bar.
Now switch on the TitroLine
the device starts the conditioning immediately.
If the anolyte has been freshly filled in, the conditioning may last 10 - 20 minutes. The drift indication is >
1500 µg/min at the beginning. When the drift has dropped below 10 µg/min, the TitroLine
is ready for the first measurements with the oven.
®
7500 KF trace:
69
®
7500 KF trace