The following document will ensure that the installation is
complete and that all installation steps and tasks have been
performed. It will also provide guidelines for best practices
and familiarization of the system after installation has been
completed. The familiarization is intended to give the system
operators a basic overview of the operation and maintenance of
the new instrument, system, and software. Familiarization is not
intended or designed to substitute a full operator training course.
Familiarization will take up to a maximum of two hours.
We cannot guarantee a complete installation or demonstration
if the site requirements are not met. If you have any questions,
please do not hesitate to contact your local Biotage
Support
group.
Please use the checklist below to track progress of both the
installation and familiarization and fill out this form electroni-
cally. A printed copy should be signed by both the Field Service
Engineer and Customer and given to the Customer after
completion.
Installation Checklist

Shipping Review

Tasks
Inspect the shipment carefully and verify that entire order has
been received.
Inspect the shipping containers for damage and review
contents for internal damage.

Site Preparations

Tasks
Ensure that the site requirements are met and that the final
instrument location is accessible and ready for installation.
Ensure that N
gas is present at a pressure of 6 +/- 0.2 Bar.
2
Ensure that Air is present at a pressure of 6 +/- 0.2 Bar with
flowrate at 5 L/min
Ensure that the N
gas fulfils the quality required according to
2
ISO 8573-1, classification 1-6-1. Indicate if not used.
© Biotage 2021
Biotage
Extrahera
®
LV-200 Installation
1-Point
®
Notes
Use the packing lists to confirm that no items are missing. Inspect
for any damages due to shipping. If the packaging or the instrument
has been damaged, confirm with the customer that the receipt of
Instrument document was completed and that a claim was initiated
with the shipping company.
Notes
If available, review the site preparation checklist document signed by
the Customer.
Other inert gas option may be chosen.
If the gas applied is not according to class x-6-x, an air dryer needs to
be ordered separately (P/N 416441SP).
LV-200 Installation and Familiarization Checklist | Page 1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Extrahera LV-200 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Biotage Extrahera LV-200

  • Page 1 Familiarization will take up to a maximum of two hours. We cannot guarantee a complete installation or demonstration if the site requirements are not met. If you have any questions, please do not hesitate to contact your local Biotage 1-Point ®...
  • Page 2 Remove the Packing and accessory Box Two or more persons are needed when lifting the system. Carefully lift the Extrahera LV-200 by using the handles and place it in a The weight of a system is 80 kg (176 lbs).
  • Page 3 Verify visually that all solvents levels are approximately equally filled. Clean & Primed Solvent System Performance. Perform the Pressure Head Function Test. Verify the functionality of the Waste valve. The valve should open and close without restriction. Perform a Pipette Performance Test. © Biotage 2021...
  • Page 4 Biotage Extrahera LV-200 Installation and Familiarization Checklist | Page 4 ® ™ Record Section System Information Extrahera LV-200 Serial # Application SW Version Controller FW Version Mover FW Version Pumper FW Version OS version Clean & Primed Solvent System Performance Checked (Yes/No)
  • Page 5 Explain how to run a Method. Show the preparation steps before executing a run. 3. Safety and Safe Operation Overview √ Tasks Review the safety precautions necessary when working with the Use the Installation and safety guide. Extrahera LV-200. © Biotage 2021...
  • Page 6 Literature Number: UI474 © 2021 Biotage. All rights reserved. No material may be reproduced or published without the written permission of Biotage. Information in this document is subject to change without notice and does not represent any commitment from Biotage. E&OE.

This manual is also suitable for:

417000

Table of Contents