Water Connection; Electrical Connection; Commissioning; Taking The Appliance Out Of Use - STIEBEL ELTRON PSH 30 Comfort Universal Operation And Installation

Wall mounted dhw cylinder
Hide thumbs Also See for PSH 30 Comfort Universal:
Table of Contents

Advertisement

Available languages

Available languages

  • ENGLISH, page 14
.CZ`<<`.HC
HBB.ZZ.HC.C&
9.3

Water connection

Risk of damage
Carry out all water connection and installation work in
accordance with regulations.
If the water pressure is higher than 0.5 MPa, install a
pressure reducer in the cold water inlet.
ª Thoroughly flush out the cold water line before connecting
the appliance, so that no foreign matter gets into the cylinder
or safety valve.
ª Route the drip water outlet of the safety valve to a drain free
from the risk of frost, with a constant slope to ensure the
unrestricted flow of the water to the drain. The drip water
outlet must always remain open to the atmosphere.
9.4

Electrical connection

DANGER Electrocution
Carry out all electrical connection and installation work
in accordance with relevant regulations.
DANGER Electrocution
Only use a permanent connection to the power supply.
The appliance must be able to be separated from the
power supply by an isolator that disconnects all poles
with at least 3 mm contact separation.
Risk of damage
Observe the type plate. The specified voltage must match
the mains voltage.
Earth conductor
Ensure that the appliance is earthed.
See chapter „Specification / Wiring diagram".
DANGER Electrocution
The power cable must only be replaced (for example if
damaged) by contractors authorised by the manufac-
turer.
The appliance is supplied with a flexible power cable with wire
ferrules and without plug, ready to connect.
ª If the cable is of insufficient length, unclamp it from the ap-
pliance. Use a suitable installation cable (see chapter „Speci-
fication / Data table").
ª When routing the new power cable, ensure that it is water-
proof as it passes through the existing cable entry, and is
correctly routed and connected inside the appliance.
Ä
’TZ+ HB%HV` eC.pVZ<

10. Commissioning

ª Open the shut-off valve in the cold water line.
ª Open a downstream draw-off valve until the appliance has
filled up and the pipes are free of air.
ª Adjust the flow rate. Observe the maximum permissible flow
rate with a fully opened tap (see chapter „Specification /
Specification").
ª Turn the temperature selector to maximum temperature.
ª Switch the mains power ON.
ª Check the function of the appliance.
ª Check the function of the safety valve.

11. Taking the appliance out of use

ª Disconnect the appliance from the mains at the MCB/fuse in
the fuse box.
ª Drain the appliance. See chapter „Maintenance / Draining the
appliance".

12. Recommissioning

See chapter „Commissioning".

13. Appliance handover

ª Explain the appliance function to users and familiarise them
with its operation.
ª Show the user the safety valve and its operation instructions,
and explain its significance.
ª Make users aware of potential dangers, especially the risk of
scalding.
ª Hand over these instructions.
qqq Z`. <é<`VHC HB

Advertisement

Table of Contents
loading

Table of Contents