Dismantling Of Escape Release (Order No. 570466 - 570 475) - Pilz PSEN ml b 1.1 Operating Manual

Hide thumbs Also See for PSEN ml b 1.1:
Table of Contents

Advertisement

Installation
}
The screws of the push/pull cable [2] can be loosened to make installation easier (e.g.
when the push/pull cable is to be run through a wall). The screws must be fixed with 6 -
6,5 Nm after the escape release is installed.
8.5.5

Dismantling of escape release (order no. 570466 - 570 475)

If the push/pull cable is to be run through a conduit pipe, the cable has to be uninstalled at
the escape release first.
Prerequisites
}
The conduit pipe must have a diameter of at least 12 mm.
Procedure
1. Lift off the cover [1] (e.g. with a screwdriver with a flat blade).
Legend
2. Loosen the nut [2].
3. Pull out the push/pull cable with the slot nut [4] and remove the slot nut and the nut [2]
from the cable.
4. Run the cable through the conduit pipe.
5. Push the nut [2] and the slot nut [4] over the fork head [3] back on the cable.
6. Push the cable with the fork head [3] on the fork in the escape release. The slot nut [4]
must be fitted into the nut again.
7. Tighten the nut [2] with 6 - 6,5 Nm.
8. Put the lid [1] back on.
Operating Manual PSEN ml b 1.1/2.1/2.2
1003884-EN-12
[1]
[1] Cover
[2] Nut M10 x 0,75
[3] Fork head
[4] Slot nut
[3]
[4]
[2]
| 50