Receiving & Inspecting The System - WhisperKool Mini Platinum Split H.E. PSMINI Owner's Manual

Table of Contents

Advertisement

RECEIVING & INSPECTING THE SYSTEM
Upon receiving your unit:
Use caution when lifting and check package for damage.
Lift only at the designated hand-hold locations on the shipping container, or fully support the unit from underneath. A
shipment may include one or more boxes containing accessories.
Before opening the container, inspect the packaging for any obvious signs of damage or mishandling.
Write any discrepancy or visual damage on the bill of lading before signing.
Allow the condensing unit to sit for 24 hours prior to start-up. The condensing unit can be placed in the installation
location, piped and evacuated during this time.
Review the packing slip to verify contents
Check the model number to ensure it is correct.
Check that all factory options ordered are listed.
If any items listed on the packing slip do not match your order information,
Check all shipped boxes for the following contents:
Evaporator Unit Box:
(1) Mini Split evaporator unit
Documentation bag:
Wall mount H.E. owner's manual
R-134a H.E. split system warranty checklist
Evaporator unit installation template
Accessory kit bag:
Evaporator installation hardware bag
(KDT and 24V unit)
KDT unit only
KDT Plus hardware bag
Retractable bottle probe
KDT Plus display cable (50 feet)
KDT Plus wall mount bracket assembly
KDT Plus flush mount bracket assembly
KDT Plus display assembly
Flush mount template
Please leave the unit in its original box until you are ready for installation. This will allow you to move the product safely without
damaging it. When you are ready to remove the product from the box, refer to the installation instructions.
TIP: Save your box and all packaging materials. They provide the only safe means of transporting/shipping the unit.
Page 7
08/04/21
contact Customer Service immediately.
Condensing Unit Box:
Evaporator installation hardware bag:
(2) 1/2" x 1/2" nylon barbed fitting
(1) 1/2" barbed tee
(1) Double-D strain relief
(4) 3/4" adhesive cable tie mounts
(2) Small cable ties
(4) #8 x 13/4" hex-head screws
KDT Plus hardware bag:
(1) 11/16" OD Grommet
(2) ½" nylon hole plugs
(4) #6 x 1" PHP zinc Type A screws
(4) 8-10 x 7/8" Plastic Screw Anchor
(1) Condensing unit

Advertisement

Table of Contents
loading

Table of Contents