INSTALLATION PREMIER
B
PRE-INSTALLATION CHECK LIST
The gate leaves must be firmly fixed to the hinges on the gate pillars, they must not flex during
the movement and they must swing without any friction.
Before installing the operator, make sure you have enough room to fix the operator on the pillar.
In case the gate is like the one depicted in Pic. 1, there is no need for any modification.
Gate features and installation must comply with local regulations and standards.
The gate can be automated only if it is in good conditions and complies with EN12604 norms.
- The gate leaf must not have a pedestrian door in its structure. Should there be a pedestrian
opening, take the appropriate steps according to EN12435 norms (e.g. cutting out the motor
when the pedestrian door is opened by fixing a safety micro switch connected to the control
board).
- Make sure not to create any trapping points or areas (e.g. when the gate completely opened,
between any opening in the gate frame and the side wall).

EMERGENCY MANUAL RELEASE

This applies only if the unit is not equipped with back-up batteries. In case of a black-out, the
gate can be pulled open after the operator has been unlocked with the emergency key provided
(rotate the key clockwise by 180°, Pic. 2).
EMERGENCY MANUAL RELEASE THROUGH AN EXTERNAL STRONG
BOX
In case of a black-out, should you need to unlock the gate from outside through an external
Strong Box, secure one end of the steel cord with sheath (A) (code ACG8022) to the unlocking
lever (B) on the operator, and the other end to the unlocking device (C) inside the strong box,
as in Pic. 3 (code ACJ9071 or ACJ9078).
CAUTION
In order to manually open the gate leaf make sure of the following:
- The gate leaves must be endowed with appropriate handles;
- Position of the handles onto the gate leaves must be in risk free area;
- The manual force necessary to move the gate leaves should not be higher than 225 N, in case
of installations at domestic/private dwellings, and 390N in case of installations in business
premises (according to points 5.3.5 of the EN12453 norm).
Note: in case of an installation with an overlapping two leave swing gate, to ensure a safe/
proper locking, a mechanical bolt must be installed along with an electric lock. The mechanical
bolt (ACG5000) must be installed at the bottom of the first gate leaf to close so that it will be
triggert by the pressure of the second gate leaf. The electric lock will latch one gate leaf to
the other.
B
Parts to install meeting the EN 12453 standard
COMMAND TYPE
with manned operation
with visible impulses
(e.g. sensor)
with not visible impulses
(e.g. remote control device)
automatic
* a typical example are those shutters which do not have access to any public way
A: Command button with manned operation (that is, operating as long as activated),
like code ACG2013
B: Key selector with manned operation, like code ACG1010
C: Adjustable power of the motor
D: Safety strips and/or other safety devices to keep thrust force within the limits of
EN12453 regulation - Appendix A.
E: Photocells, like code ACG8026 (To apply every 60÷70cm for all the height of the
column of the gate up to a maximum of 2,5m - EN 12445 point 7.3.2.1)
B
28
USE OF THE SHUTTER
Skilled persons
Skilled persons
(out of public
(public area)
area*)
A
B
C or E
C or E
C or E
C and D, or E
C and D, or E
C and D, or E
C
A
Unrestricted
use
non possibile
C and D, or E
C and D, or E
C and D, or E
2
3