6.3 Assembly of BM12 CO PN63
For assembly work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must have
been completed.
Tools
•
e.g. adjustable spanner
Depressurise the compressed gas system or the respective system section and secure it against unintentional
1.
pressure build-up.
2.
Note the specified assembly instructions at all times.
Illustration
44
C
E
24 | 64
Prerequisites
•
Sealants
•
Feed line and discharge line
Preparatory tasks
D
G
F
Original installation and operation manual
Material
Always to be worn:
Description / explanation
3. Remove the dust cap [44].
Assembly instructions
•
The gradient of the condensate inlet line [C] must be ≥3
%.
•
Do not mount any filters in the condensate inlet line [C].
•
The diameter of the condensate inlet line [C] must be
≥1/2" (inner diameter ≥13 mm (0.5")).
•
Recommended interval:
Equip the condensate inlet line [C] with a shut-off
valve [D] to make simple product maintenance possible.
4. For the condensate inlet line [C] apply sealant to the
end of the pressure-resistant pipe and screw in at the
condensate inlet.
Assembly instructions
•
The condensate discharge line [F] may be laid rising
by max. 5 m (17 ft). The minimum pressure required
increases by 0.1 bar (1.5 psi) per metre of incline.
•
The diameter of the manifold [G] must be ≥1/2" and the
gradient ≥3 %.
•
Do not use shut-off valves in the condensate discharge.
5. For the drain, connect a short pressure hose [E]
(designed for the system pressure) to the condensate
discharge and the condensate discharge line [F].