Installation - Beko BEKOMAT 16 CO Original Installation And Operation Manual

Table of Contents

Advertisement

Original installation and operation manual

6.2 Installation

For assembly work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must have
been completed.
Tools
e.g. adjustable spanner
Depressurise the compressed gas system or the respective system section and secure it against unintentional
1.
pressure build-up.
2.
Note the specified assembly instructions at all times.
Illustration
24
D
E
F
Prerequisites
Material
Sealants
Feed line and discharge line
Preparatory tasks
Description / explanation
3. Remove the dust cap [24].
Assembly instructions
4. For the condensate inlet line [D] apply sealant to the
Assembly instructions
H
5. For the drain, connect a short pressure hose [F]
G
Always to be worn:
The gradient of the condensate inlet line [D] must be ≥3
%.
Do not mount any filters in the condensate inlet
line [D].
The diameter of the condensate inlet line [D] must be
≥1" (inner diameter ≥22 mm (0.86")).
Recommended interval:
Equip the condensate inlet line [D] with a shut-off
valve [E] to make simple product maintenance possible.
end of the pressure-resistant pipe and screw in at the
condensate inlet.
The condensate discharge line [G] may be laid rising
by max. 5 m (17 ft). The minimum pressure required
increases by 0.1 bar (1.5 psi) per metre of incline.
The diameter of the manifold [H] must be ≥1" and the
gradient ≥3 %.
Do not use shut-off valves in the condensate discharge.
Do not kink or block the pressure hose [F] , or route it
across storage or transport areas.
(designed for the system pressure) to the condensate
discharge and the condensate discharge line [G] using a
hose clamp.
BEKOMAT