Original installation and operation manual
6.2 Installation
For assembly work to be carried out, the following prerequisites must be fulfilled and the preparatory tasks must have
been completed.
Tools
•
e.g. adjustable spanner
Depressurise the compressed gas system or the respective system section and secure it against unintentional
1.
pressure build-up.
2.
Note the specified assembly instructions at all times.
Illustration
24
D
E
F
Prerequisites
Material
•
Sealants
•
Feed line and discharge line
Preparatory tasks
Description / explanation
3. Remove the dust cap [24].
Assembly instructions
•
•
•
•
4. For the condensate inlet line [D] apply sealant to the
Assembly instructions
•
H
•
•
•
5. For the drain, connect a short pressure hose [F]
G
Always to be worn:
The gradient of the condensate inlet line [D] must be ≥3
%.
Do not mount any filters in the condensate inlet
line [D].
The diameter of the condensate inlet line [D] must be
≥1" (inner diameter ≥22 mm (0.86")).
Recommended interval:
Equip the condensate inlet line [D] with a shut-off
valve [E] to make simple product maintenance possible.
end of the pressure-resistant pipe and screw in at the
condensate inlet.
The condensate discharge line [G] may be laid rising
by max. 5 m (17 ft). The minimum pressure required
increases by 0.1 bar (1.5 psi) per metre of incline.
The diameter of the manifold [H] must be ≥1" and the
gradient ≥3 %.
Do not use shut-off valves in the condensate discharge.
Do not kink or block the pressure hose [F] , or route it
across storage or transport areas.
(designed for the system pressure) to the condensate
discharge and the condensate discharge line [G] using a
hose clamp.
BEKOMAT
16 CO
®
Protective equipment
23 | 60