Commissioning Tasks; Operation - Beko BEKOMAT 16 CO Original Installation And Operation Manual

Table of Contents

Advertisement

Original installation and operation manual

8.2 Commissioning tasks

Illustration
E

9. Operation

As soon as the BEKOMAT
®
components necessary for the proper functioning of the BEKOMAT
If the self-test is positive, the BEKOMAT
0 For acoustic signalling, the solenoid valve cycles twice.
If the self-test is negative, the BEKOMAT
0 For acoustic signalling, the solenoid valve cycles 20 times.
The LED signalling of the various operating states can be seen in the following table.
E
is supplied with voltage, a self-test starts automatically, during which all internal
goes into normal operation.
®
goes into fail-safe operation.
®
Description / explanation
1. Supply the BEKOMAT
®
2. Slowly charge the system section with pressure. To do
this, slowly open the shut-off valve [E].
are checked.
®
BEKOMAT
16 CO
®
with voltage.
33 | 60

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bekomat bm16co

Table of Contents