Connecting The Hydraulics And Checking Clearances; Initial Set-Up For Schulte Sdx-102 And Rdx-102 Snow Blowers; Initial Set-Up For Schulte Sv Plows - Schulte FM-115 Operator's Manual

Front mount 3pt hitch
Table of Contents

Advertisement

Connecting the Hydraulics and Checking Clearances

Organize any extra length of hydraulic lines so that they do not contact the rear power shaft. Connect the
hydraulic lines to the tractor breakaways. The FM-115 includes one hydraulic circuit for raising and lowering
the snow blower and two circuits for operation of the snow blower or plow. One of the snow blower circuits
operates the chute rotator and one operates the chute deflector. For operating a V-Plow, there is one circuit for
each side. An optional 4th circuit is available for operation of snow blower with rotating drum such as the
Schulte RDX series.

Initial Set-up for Schulte SDX-102 and RDX-102 Snow Blowers

On the SDX-102 and RDX-102 snow blowers, position the lower 3PT hitch arms so that the lower pins are as
close as possible to the snow blower housing. When attaching the front mount frame's top link use 24" upper
hole position.

Initial Set-up for Schulte SV Plows

For the highest lift possible, install the three hitch ears in the lowest set of holes on the V-Plow as shown. Be
aware of dimension 'E' from page 3-4 that the cylinders are not extended so far to limit downward travel in
uneven terrain. If needed, move all three hitch ears up to gain range of motion - always maintain the 24"
spacing to the top link.
With the machine parked on level ground, adjust the top link of the FM-115 to level the blades to the ground (on
level ground, this should make the main pin on the V-Plow vertical).
FM-115 07/15
© 2015 Alamo Group Inc.
ASSEMBLY
Assembly Section 3-10

Advertisement

Table of Contents
loading

Table of Contents