Daikin VRV IV+ Installer And User Reference Manual page 69

Table of Contents

Advertisement

REYQ8~20+REMQ5U7Y1B
VRV IV+ heat recovery
4P561154-1A – 2020.10
NOTICE
Prepare a water drainage channel around the foundation to drain waste water
from around the unit. During heating operation and when the outdoor
temperatures are negative, the drained water from the outdoor unit will freeze
up. If the water drainage is not taken care of, the area around the unit might be
very slippery.
When installed in a corrosive environment, use a nut with plastic washer (a) to
protect the nut tightening part from rust.
a
17
Unit installation
|
Installer and user reference guide
69

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the VRV IV+ and is the answer not in the manual?

Questions and answers

Table of Contents