Handling - Riello KV/200 20 ISC Solar Installation And Maintenance Manual

Floor standing condensing boilers
Hide thumbs Also See for KV/200 20 ISC Solar:
Table of Contents

Advertisement

HANDLING

Once you have removed the packaging, proceed as fol-
lows to handle and move the boiler.
- Unscrew the 4 screws (A) shown in the figure and
remove the boiler from the pallet.
- Remove the front panel (1) to facilitate handling and
movement of the boiler.
- Grip the boiler at points (B) and tilt it backwards, then
grip it at points (B) and (C) to lift it. An optional handling
bracket kit is available to provide a better grip at points
(B).
b
Do not lift the boiler by its casing but only by
rigid parts such as its base and top frame.
b
Wear suitable personal protective equipment and
use suitable safety devices.
a
Do not dispose of packaging material into the envi-
ronment, or leave it within the reach of children,
since it can become a potential hazard. Dispose of
packaging material in compliance with applicable
legislation.
18
INSTALLER
A
OPEN
1
LIFT
C
C
A
TILT
B
B

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kv/200 30 isc solar2004496620044968

Table of Contents