SOLAR CONTROLLER
The first time you switch on the boiler, you will need to set
time and day. To do so, proceed as follows.
- Turn the function selector (3) to " "
- Turn the parameter selector (4) until the "Clock" menu
appears.
- Press the confirm key (2).
- Turn the parameter selector (4) to set the desired time.
- Press the confirm key (2) to confirm.
- Repeat the above steps to set the date.
- Turn the function selector (3) to "
b
You can exit programming mode at any time simply
by turning the function selector (3). If you exit pro-
gramming mode in this way, any changes made but
not confirmed (by pressing the confirm key) will be
lost.
STARTING UP THE BOILER
If a timer or room thermostat is installed, these must be
switched on and adjusted to a temperature higher than
current room temperature before the boiler can start up.
The boiler will remain in stand-by mode until the burner
ignites following a request for heat. The green LED (3) on
the left of the control panel lights to show that a flame is
being detected.
The boiler will carry on functioning until the set tempera-
tures are reached, when it will return to stand-by mode
while continuing to display the central heating flow tem-
perature.
If any ignition or functioning errors occur, the boiler per-
forms a "SAFETY SHUTDOWN". The green LED on the
control panel goes out and an error code flashes on the
display. The red LED (5) indicates a burner lock-out. See
the "WARNING LEDS AND ERRORS" section for details
on the various error codes and how to reset the boiler.
38
TECHNICAL ASSISTANCE SERVICE
"
F1
F3
kWh
A1
F4
F2
Esc
2
1
3
0
4
bar
2
1
3
0
4
bar
3
4
2
3
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kv/200 30 isc solar2004496620044968

Table of Contents