Huawei OptiX PTN Series Quick Installation Manual page 36

Packet transport platform
Hide thumbs Also See for OptiX PTN Series:
Table of Contents

Advertisement

2
Equipment Inspection Before Power-On
a
Provisioning Power for the Equipment
Power off the first power cabinet. Switch the PIU to ON, and use a multimeter to all of the measure resistance
between any two of NEG(-), RTN(+), and PGND (PGND). Switch the PIU to OFF, and use a multimeter to
measure all of the resistance between any two of NEG(-), RTN(+), and PGND (PGND).
To prevent short circuit between power terminals, the resistance values must be as follows:
PIU circuit breaker
Switch the PIU to ON
Switch the PIU to OFF
Check the value of the first power cabinet fuse capacity.
The maximum operating current of a single channel is 60A, the value of the first power cabinet fuse capacity is
recommended as 63A .
Mapping the first power cabinet circuit breaker (fuse) to the device (subrack) is recommended. To be specific, a
channel of power sent by a circuit breaker of the first power cabinet can be connected to only one device. If a
channel of power sent by a circuit breaker of the first power cabinet is connected to multiple devices, when a traffic
error occurs on one device, the circuit breaker may take protection measures, causing multiple devices to be
powered off.
Power on the first power cabinet, and keep the PIU in the OFF state, and measuring the voltage between PIU NEG(-)
and RTN(+). The following table lists the normal voltage range:
-48 V DC Power Source
Voltage
Range
CAUTION
Do not power on the equipment when the power voltages are not within the specified ranges.
b
Inspecting the Equipment Before Power-On
WARNING
Do not insert or remove power plugs and PIU boards when they are energized.
Power off the PIU power switch, and check whether the power supplies of the subrack are normal. If the power
supplies are normal, the PIU PWR indicator is steady green. Switch on the PIU standby power, switch off the PIU
master power, and check whether the power supplies of devices are normal. If the power supplies are normal,
keep the PIU standby power in the ON state, and switch on the master power again.
Check the power indicator (green) at the top of the cabinet. The indicator should be lit.
After the subrack is powered on, test the air flows to check that the Fan powered boxes are working.
Check that the STAT indicator on the Fan powered box is steady green. If the STAT indicator is steady red, the
Fan powered box is faulty. In this case, rectify the Fan powered box faults and then commission the equipment.
NEG(-) and RTN(+)
1k~20k Ohms
-40V ~ -57.6V
NEG(-) and PGND
33
RTN(+) and PGND

Advertisement

Table of Contents
loading

This manual is also suitable for:

Optix ptn 7900-32

Table of Contents