comprises the current measured values and also the schedule for the next inter-
val-controlled actions, e.g. measuring, calibrating or cleaning.
figure 4-6 Operating condition (tab Status, example 2-channel variant)
In the Status tab, the following information on the current operating condition is
available:
 Current operating condition (e.g. measuring, calibration, etc.)
 Measured value of the last measurement with date and time
 Schedule for the next interval-controlled action, e.g. measuring, calibrating
and cleaning
4.5.2 Information on the expected lifetimes of replacement parts (tab

Laufzeiten)

The Laufzeiten tab provides a quick overview of the maintenance activities due.
This information facilitates the planning and co-ordination of the maintenance
activities for the most important replacement parts (chemicals and MultiPort
valve) of the Alyza IQ.