Peak Load Prevention; Alternating Current; Heater; Payment System - Miele PWM 508 Mop Star 80 Operating And Installation Instructions

Table of Contents

Advertisement

Peak load prevention

The peak-load cut-off function can be
deactivated for disinfection
programmes. When a signal is
registered, the washing machine's
heater is not switched off.
Factory setting: Off

Alternating current

The time remaining displayed depends
on the electrical connection. If a
single-phase connection is used, the
setting must be switched to No.
Factory setting: Yes

Heater

The heater can be switched off and
the Thermostop step is skipped. In
addition, heater fault monitoring is
deactivated.
Factory setting: On
Supervisor level

Payment system

External hardware is connected via the
Miele XCI box.
If you wish to change the settings later,
please contact Miele.

Settings for payment systems

You would like to connect a payment
system.
– No payment system
The next settings are skipped and
initial commissioning can be
completed.
– Programme operation
The machine is operated using a coin
box. The user purchases a wash
programme.
– Time operation
The machine is operated using a coin
box. The user purchases a time-
controlled programme.
– Timed operation with pulse counter
For payment systems where the
usage time is increased each time a
coin is inserted.
81

Advertisement

Table of Contents
loading

Table of Contents