Replacing The Gas Valve; Gas Valve Calibration; Replacing The Electronic Board; Replacing The Electronic Board + Gas Valve - Baxi Eco5 Compact+ Operating And Installation Instructions

High performance gas-fired wall-mounted boiler
Hide thumbs Also See for Eco5 Compact+:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 21

11.2 REPLACING THE GAS VALVE

When replacing the gas valve, perform the following operations:
• switch off the boiler;
• close the gas inlet valve;
• replace the gas valve;
• open the gas inlet valve and make sure there are no gas leaks;
• perform the operations described in points C of the GAS CONVERSION section.

11.3 GAS VALVE CALIBRATION

To calibrate the gas valve, perform the operations described in points C of the GAS CONVERSION section.

11.4 REPLACING THE ELECTRONIC BOARD

When replacing the electronic board, perform the following operations:
• disconnect the boiler from the mains power supply.
• close the gas inlet valve;
• remove the front panel of the boiler;
• replace the electronic board;
• power the boiler;
• "the display shows "E98";
• set parameters F01, F02, F03 and F12 as described in the SETTING PARAMETERS section according to the boiler model
indicated on the data label.

11.5 REPLACING THE ELECTRONIC BOARD + GAS VALVE

When replacing the electronic board and the gas valve at the same time, perform the following operations:
• disconnect the boiler from the mains power supply.
• close the gas inlet valve;
• remove the front panel of the boiler;
• replace the electronic board;
• replace the gas valve;
• open the gas inlet valve and make sure there are no gas leaks;
• power the boiler;
• "the display shows "E98";
• set parameters F01, F02, F03 and F12 as described in the SETTING PARAMETERS section according to the boiler model
indicated on the data label.
• perform the operations described in points C of the GAS CONVERSION section.

12. VISUALISATION OF PARAMETERS ON THE DISPLAY ("INFO" FUNCTION)

Press
for at least 6 seconds to display information concerning boiler operation.
When the "INFO" function is enabled, the message "A00" alternating with the boiler delivery temperature, is shown on the
display:
Press buttons
to display the following information:
A00: current heating delivery temperature (°C);
A01: current DHW temperature (°C);
A02: current external temperature (°C) (with external sensor connected);
A03: current fumes temperature (°C);
A04: instantaneous (%) value of the gas valve control signal;
A05: power range (%) (MAX CH);
A06: heating setpoint temperature (°C);
A07: DHW temperature setpoint (°C);
A08: last error that occurred in the boiler;
A09: not used;
A10: not used.
This function remains active for 3 minutes. It is possible to interrupt the "INFO" function in advance by pressing
the power to the boiler.
7217473.07 (1-11/17)
30
CG_1808
or turning off

Advertisement

Table of Contents
loading

Table of Contents