Replacing The Gas Valve; Gas Valve Calibration - Baxi ECO COMPACT Operating And Installation Instructions

High performance gas-fired wall-mounted boiler
Hide thumbs Also See for ECO COMPACT:
Table of Contents

Advertisement

Available languages

Available languages

Burner injector-pressure table
Gas type
Injector diameter (mm)
Burner pressure (mbar*)
REDUCED HEAT OUTPUT
Burner pressure (mbar*)
RATED HEAT OUTPUT
N° injectors
* 1 mbar = 10.197 mm H
O
2
D) Electronically calibrate the gas valve
D1) Electronically adjust to reduced heat output:
• set parameter F08-F09 = 0 following the procedure described in the SETTING PARAMETERS section;
• open a hot water tap that can provide a flow rate of at least 10 litres a minute or make sure there is maximum heat demand;
• slowly increase (not more than 2 points at a time) the value of parameter F45 until the pressure read with the pressure gauge
increases; then reduce the value of F45 by 2 points and press
D2) Electronically adjust to nominal heat output:
• set parameters F08-F09 = 100, F48 = 50;
• open a hot water tap that can provide a flow rate of at least 10 litres a minute or make sure there is maximum heat demand;
• slowly increase (not more than 2 points at a time) the value of parameter F48 until the pressure read with the pressure gauge
reaches the value indicated in the burner pressure/injectors table (NOMINAL HEAT OUTPUT); then increase the value of F48
by 2 points;
• set parameters F64 = 0, F18 = 0 and press
• turn off the two-pole switch to disconnect the boiler from the power supply for at least 5 seconds;
• put the front panel back in place.
E) Final checks
• Note down the conversion on the boiler rating plate, specifying the type of gas and indicating that calibration was performed.
After performing electronic calibration, set parameter F08-F09 as shown in the table below.
24 F
G20 - G25.1
F08
055
F09
100
flashes on the display when calibrating the gas valve, disconnect the boiler from the power supply and repeat the
If
calibration procedure starting from point B).

12.2 REPLACING THE GAS VALVE

When replacing the gas valve, perform the following operations:
• switch off the boiler;
• close the gas inlet valve;
• replace the gas valve;
• open the gas inlet valve and make sure there are no gas leaks;
• perform the operations described in points B, C, D of the GAS CONVERSION section.

12.3 GAS VALVE CALIBRATION

To calibrate the gas valve, perform the operations described in points B, C, D of the GAS CONVERSION section.
1.24 F - 24 F
G20
1.35
2.1
11.8
11
to save;
1.24 F – 18 F
G31
G20 - G25.1
060
100
100
18 F - 14 F - 1.14 F
G31
G20
0.85
1.18
5.4
3.6
28.8
11.6
to save.
14 F
G31
G20 - G25.1
050
100
35
G31
0.77
7.8
24.7
11
1.14 F
G31
G20 - G25.1
060
050
050
7110102.03 (1-06/13)
G31
060
060

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents