Installing The Switch Using Optional Four-Post Rack-Mount Brackets - Avaya 5900 Series Installing Manual

Ethernet routing switch
Hide thumbs Also See for 5900 Series:
Table of Contents

Advertisement

Figure 16: Rear-mounted rack installation
4. Insert and tighten the rack mount screws.
5. Verify that the switch is securely fastened to the rack.
You can proceed with the installation by connecting power and network connections to the
switch.
Installing the switch using optional four-post rack-mount
brackets
Perform this procedure to assemble and install the four-post rack-mount bracket kit.
Before you begin
ERS 5900 Series four-post server rack-mount kit — AL5911001-E6
Tool requirements
• Phillips screwdriver to attach brackets to the switch and the switch to the rack.
September 2017

Installing the switch using optional four-post rack-mount brackets

Installing Avaya ERS 5900 Series
Comments on this document? infodev@avaya.com
41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents