Installing Ers 59100Gts And Ers 59100Gts-Pwr+ In An Equipment Rack - Avaya 5900 Series Installing Manual

Ethernet routing switch
Hide thumbs Also See for 5900 Series:
Table of Contents

Advertisement

Figure 12: Rear-mounted rack bracket installation
Installing ERS 59100GTS and ERS 59100GTS-PWR+ in an
equipment rack
About this task
Install ERS 59100GTS and ERS 59100GTS-PWR+ on an equipment rack. To install other switches
in ERS 5900 Series, see
Before you begin
Tool requirements
• Phillips screwdriver to attach brackets to the switch and the switch to the rack.
Rack requirements
• Space of 2.8 inches (7.1 cm) for each switch is available in an E1A or 1EC standard 19 inch
(48.2 cm) equipment rack and T1A 23 inch (58.5 cm) equipment rack.
• Appropriate rack space is available to accommodate 2U switch height (88.5 mm).
• Rack is bolted to the floor and braced if necessary.
• Rack is grounded to the same grounding electrode used by the power service in the area. The
ground path must be permanent and must not exceed 1 Ohm of resistance from the rack to the
grounding electrode.
September 2017

Installing ERS 59100GTS and ERS 59100GTS-PWR+ in an equipment rack

Installing ERS 5900 switch in an equipment rack
Installing Avaya ERS 5900 Series
Comments on this document? infodev@avaya.com
on page 35.
37